High-Speed Rail & Metro

Bullet train corridor, metro rail viaducts, elevated stations, and high-speed rail infrastructure — contributing to India's fastest rail projects.

High-Speed Rail & Metro

Bullet train corridor, metro rail viaducts, elevated stations, and high-speed rail infrastructure — contributing to India's fastest rail projects.

Discuss Your Project
2+
Projects Completed
10+ km
Distance Built
95%
On-Time Delivery
Key Clients
NHSRCLDMRCGMRCRVNLMetro Rail CorpsDFCCIL
Capabilities

What We Deliver

Our high-speed rail & metro division offers end-to-end solutions across the following areas.

High-Speed Rail Projects

Metro Rail Projects

Elevated Rail Corridors

Station Infrastructure

High-Speed Rail Standards

Design Speed350 km/h (HSR Corridor)
Track Gauge1435mm Standard Gauge
Viaduct DesignJRTT / Shinkansen Specs
Segment CastingMatch-Cast, Steam Cured
Pre-StressingMulti-Strand, 15.2mm
QualityJapanese QA Standards

Equipment & Machinery

Launching Gantry (900T)
Segment Casting Moulds
Pre-Stressing System
Bored Pile Rig (2.0m)
Batching Plant (120 cum/hr)
Survey GPS Station
Our Methodology

High-Speed Rail Construction Methodology

A specialized six-phase approach tailored specifically for high-speed rail & metro — not a generic process.

01

Alignment & Piling

GPS-guided alignment survey, bored pile foundation (1.2-2.0m dia) with sonic integrity testing and pile load tests.

02

Pier & Pier Cap

Pier construction using climbing formwork, pier cap with corbel design for pre-cast segment bearings.

03

Pre-Cast Segment Casting

Match-cast segmental box girders in casting yard with steam curing, geometric control, and epoxy joint preparation.

04

Segment Erection

Launching gantry operation — segment-by-segment erection, pre-stressing with multi-strand jacks, and geometry check.

05

Track & Systems

Ballastless track slab, rail installation, OHE (overhead electrification), signaling, and telecom systems.

06

Integration & Testing

System integration testing, speed trials, safety certification by CMRS, and operational readiness assessment.

Our Edge

Why VRSIPL for High-Speed Rail?

What sets us apart from other contractors in this domain.

Active contributor to India's Bullet Train (MAHSR) project

Pre-cast segmental viaduct construction expertise

International-standard quality management (Japanese QA protocols)

Specialized workforce trained in high-precision rail construction

Have a High-Speed Rail & Metro Requirement?

Let our experienced team help you plan, design, and execute your next project. Contact us today for a consultation.